Put the cabinet revision and expected operating conditions on one sheet. Specify the flow at the required pressure, supply, connector and the filter or guard that will be fitted. At the sample review, compare the returned drawing with the actual cabinet opening. Agree on the checks to repeat with the filter installed before the first […]