How to prepare a sample brief for an enclosure cooling fan

Put the cabinet revision and expected operating conditions on one sheet. Specify the flow at the required pressure, supply, connector and the filter or guard that will be fitted.

At the sample review, compare the returned drawing with the actual cabinet opening. Agree on the checks to repeat with the filter installed before the first purchase order.

Review Hongbo Motor’s industrial cooling catalog to identify candidate fan families and request the corresponding model data.

This procurement resource was prepared for Hongbo Motor.

Comments

  • No comments yet.
  • Add a comment